Spectra-precision ProMark 800 Reference Manual Instrukcja Użytkownika Strona 55

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 54
43
Precise Surveying - Field Applications & Concepts
Key Points
1. Same system setup for the base and the rover.
2. The rover is stationary throughout the survey.
3. Occupation time=Observation time
4. Initialization and masking problems minimized as the
rover is stationary.
“Stop & Go”
Kinematic Survey
Typical Use
Surveying Several Points within a Relatively Small Area.
Reference Point
Data collected at the base
Data collected on the survey point
Observation Time
Baseline
Base
Survey Point
Rover
Przeglądanie stron 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 427 428

Komentarze do niniejszej Instrukcji

Brak uwag