Spectra-precision Survey Pro v4.6 Recon-Nomad Reference Manual Instrukcja Użytkownika Strona 270

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 481
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 269
Survey Pro Reference Manual
R-262
Post Processing
Survey Post Processing.
Post processing data collection involves two steps. First, you must
open a file and begin logging GPS raw data for post processing.
Second, you must measure the antenna height and enter the antenna
and station ID for each point you occupy. The Post Processing
routine is described, starting on Page R-205
Projection
Survey Projection.
The Projection Information screen is used to select and solve the
horizontal and vertical projections, which are used to transform GPS
measured WGS84 coordinates (latitude, longitude, height) into local
coordinates (North,East,Elevation). The screen is also used to switch
between mapping plane and localization mode. The buttons available
will vary depending on the current projection mode.
This screen and the screens accessed from it are nearly the same as
those found in the GPS module, which are described on Pages R-211
to R-233. The Solve Localization
screens vary slightly and are
described on Page 257.
Przeglądanie stron 269
1 2 ... 265 266 267 268 269 270 271 272 273 274 275 ... 480 481

Komentarze do niniejszej Instrukcji

Brak uwag